NE Gateway Sanitary and Storm Sewer Replacement
RFP Schedule: October 31, 2025 – December 4, 2025
Contract Award: January 2026
The City is nearing completion of an update to the community’s Water Reclamation Facility Plan and Conveyance System Master Plan (master plans). These master plans identify capacity shortfalls in the sanitary sewer conveyance system. Thus, upsizing the existing 21-inch diameter pipelines to minimum 30-inch diameter pipelines is anticipated to meet estimated peak flows. The existing 48-inch diameter storm sewer is not capacity constrained but needs to be replaced/rehabilitated due to structural deficiencies. The NE Gateway sanitary sewer replacement is a high priority improvement project. The storm sewer replacement/rehabilitation is included in the scope of this project due to:
· multiple failure points along this pipeline;
· the opportunity to minimize neighborhood disruption, and;
· to take advantage of cost savings from concurrent construction.
Contact Information
Project Manager: Kevin Wood
Email: Kevin.Wood@mcminnvilleoregon.gov
Phone: 971-387-1125
 
         
 